Flat-pack kitchen units are among the most satisfying and most demanding assembly projects. The units themselves are simple boxes, but the layout, levelling and fixing to walls decide how the kitchen looks and works for years. This is general guidance; plumbing, gas and electrical work must be done by qualified people.

Plan before you build

Measure carefully

Check the room dimensions twice, including alcoves, window positions and any pipework. Draw the layout and mark where appliances, sink and hob sit. Allow for ventilation and clearances required by appliance makers.

Order of work

Plan the sequence: base units first, then wall units, then worktops. Appliances, plumbing and electrics follow, using the right trades.

Check deliveries

Cabinets come in many boxes. Check each against the order list on delivery, and store them flat and dry.

Assembling the units

Most units are assembled on the floor, then lifted into position.

  1. Lay out parts, checking the booklet.
  2. Build the carcass using dowels and cam fixings, checking squareness with diagonals.
  3. Fit the back panel to hold it square.
  4. Attach legs or plinths to base units.
  5. Fit doors and drawer fronts after the unit is in place, adjusting hinges and runners for even gaps.

Take your time at the hinges. Even gaps across the whole run make the biggest visual difference.

Fitting and levelling

Starting point

Start from the highest point of the floor, or at a corner. Use adjustable feet to level each unit in both directions, and clamp adjoining units together before screwing them side to side.

Fix to the wall

Base units are typically fixed to the wall through rails or brackets, and wall units are fixed using hanging rails or brackets rated for the load. The correct fixing depends on the wall type, which is why the choice of plugs and screws matters. See anchoring tall furniture to walls for the principles of wall types.

Check services

Before drilling, check for pipes and cables behind walls. Isolate and consult a qualified person if in doubt.

Worktop basics

  • Worktops are heavy and awkward; plan for two or three people.
  • Measure twice before cutting, and use the correct blade and technique to prevent chipping.
  • Corner joints need accurate cutting, and some laminates and solid timber need specific jigs.
  • Seal cut edges, especially around sink cut-outs, to prevent water ingress.
  • Solid surfaces such as stone or quartz are normally cut and fitted by the supplier or a specialist.

What to leave to the professionals

Gas, electrics, plumbing and complex worktop cutting are specialist jobs that require appropriate skills and, in some cases, certification. Flat-pack unit assembly and fitting is often within DIY or competent handyman scope, but check the scope of each provider and what their offer includes.

Time and effort

A full kitchen is not a one-day job for most DIYers. Allow time for assembling units, levelling, fixing, adjusting doors and fitting worktops. An experienced assembler may build units far faster than a novice, which is where hiring can pay off. See what to prepare before an assembler arrives.

A suggested working order

  1. Check the delivery against the plan, panel by panel, and note any damaged items straight away.
  2. Mark the floor and walls with the unit positions, working from the highest floor point.
  3. Build base units on the floor and add legs, but leave doors off until later.
  4. Set the first unit in the corner or at the start point and level it front to back and side to side.
  5. Connect the neighbouring units, checking level each time.
  6. Fix to the wall using the rails or brackets provided, after checking for pipes and cables.
  7. Fit wall units after bases, then doors, handles and plinths.

Common mistakes

  • Starting in the middle of a run, which makes problems accumulate at the ends.
  • Not allowing for out-of-square corners and uneven floors.
  • Cutting a hole for a hob or sink without checking the template.
  • Over-tightening hinges and cracking chipboard.
  • Forgetting to leave space for appliances.

What to leave to a trade

Anything involving gas, mains electrics, water supply or waste connections should be done by an appropriately qualified tradesperson, as the regulations are strict. Cutting stone or laminate worktops also needs specific tools and can chip expensively; many people choose to have the worktops cut and fitted professionally even if they assemble the units themselves.

See how long flat-pack furniture takes to assemble for time planning, and how to find studs, pipes and cables before drilling before fixing wall units. General information only.

Preparing the room

Clear the room, protect the floor, and turn off water and power where you will be working close to services, which is best done by a qualified person. Allow space to lay out panels in groups by unit, with fixings labelled by unit number. Keep walkways clear so panels are not stepped on or leant against a wet wall.

Frequently asked questions

Can I assemble kitchen units myself?

Many people do, with patience and basic tools. Plan carefully, and treat plumbing, gas and electrical work as separate matters for qualified people.

Why are my doors uneven?

Hinges and drawer fronts have adjustment screws. Units that are not level or square also cause uneven gaps, so check those first.

Do I need two people for worktops?

Almost always. Worktops are heavy and long, and lifting alone risks damage and injury.